Derby-based, Green Site Solutions, the site lighting division of ISS Labour Ltd., is an environmentally sound supplier of a range of lighting solutions to the UK rail industry. Their markets encompass; construction, civil engineering, overhead line electrification, and signalling, alongside telecommunication systems.
Consistent with Green Site Solution’s sustainable attributes, the company undertook to expand and enhance its fleet of battery-powered site lighting towers. This process led Green Site Solutions to our tower lights, and in particular, the X-ECO HYBRID LITHIUM product.
Following careful evaluations, which included considering a number of other suppliers' products, Green Site Solutions took the decision to place an order for twenty X-ECO HYBRID LITHIUM sets, and as soon as they were delivered, immediately sent them out on hire to projects right across the UK.
“In the main, we have had a positive reaction from our clients. They certainly appreciate the silent running of the Trime X-ECO HYBRID LITHIUM. I think the Trime service regime is good as I have not had any negative comments from our fitters”, added Gary.
Our X-ECO HYBRID LITHIUM is a LED lighting tower that is powered by a combination of a lithium battery and a small fuel-efficient diesel engine. The X-ECO HYBRID LITHIUM can be fully recharged in less than two hours. This means that for 80% of operation, the X- ECO HYBRID LITHIUM is powered exclusively by its batteries and therefore emits zero noise and zero carbon emissions. We have calculated that the X-ECO HYBRID LITHIUM will bring significant cost savings and environmental gains when compared to a standard lighting tower.
Green Site Solutions asserts ‘that they are focussed on providing environmentally conscious, innovative, and creative solutions which are fundamental to their commitment to support a carbon-neutral position for themselves and their clients'.